SECTION 3 — The MUYALTA Project (Building 1)

🏗️ Section 3 — The MUYALTA Project (Building 1)

📍 3.1 — Project Overview & Location Map

“Welcome to MUYALTA — where Riviera Maya growth meets sustainability, comfort, and investment-grade returns.”

MUYALTA is the flagship development of the MUY Token series, a modern mixed-use building located in the Ejido neighborhood of Playa del Carmen — one of the city’s fastest-appreciating zones.

📍 Project Location

Lot 1, Block 259, Zone 1 Corner of Calle 13 Sur and Calle Diagonal 70 Sur Colonia Ejido, Playa del Carmen, Mexico

📍 Connectivity Highlights

  • 34.8 miles to Cancún International Airport

  • 7.5 miles to Cozumel via Playa Ferry

  • Minutes from 5th Avenue, hospitals, and beaches

🏢 Building Snapshot

MUYALTA is a 4-story building, featuring:

  • Ground Floor: 4 pre-leased commercial units (clinic, law firm, pharmacy, Mystard HQ)

  • Floors 2–4: Residential units for short- and mid-term rental

  • Basement: Underground parking, cistern

  • Rooftop: Pool, BBQ, bar, panoramic views

Unit Type
Size
Features

Loft

75.08 m²

1BR, 1.5BA, 2 balconies

D11

104.11 m²

2BR, 3 balconies, kitchen bar, laundry

🌱 Eco-Luxury & Tech

  • Solar panels, rainwater harvesting

  • Water treatment & low-maintenance infrastructure

  • Smart key systems + full surveillance

  • Elevator + backup power

📣 MUYALTA is more than a building — it’s the architectural foundation of a scalable tokenized real estate ecosystem.


📍 3.2 — Architectural Plan & Use of Space

“Designed for function. Engineered for flexibility. Built for yield.”

🧱 Floorplan Strategy

Floor
Purpose
Description

Basement

Utility

Parking, cistern, elevator access

Ground

Commercial

4 leased units (Clinic, Law Firm, Pharmacy, HQ)

Floors 2–4

Residential

1BR, 2BR, Lofts, Studios, PH

Rooftop

Amenity

Pool, bar, BBQ, skyline views

🛏️ Unit Typologies

Unit
Size
Features

Loft

75 m²

1BR, 1.5BA, balconies, open plan

2BR Corner

104 m²

2BR, 2BA, kitchen bar, laundry

1BR Compact

59–68 m²

Patio/balcony, tech-ready

Studios

32–39 m²

Balcony, smart storage

PH

164 m²

3BR, 3BA, private terrace, elevator

All units include smart locks, modern finishes, rooftop access. Residential includes parking.

🔍 Use-of-Space Logic

  • Commercial anchors ensure baseline yield

  • Tiered residential flexibility for seasonal demand

  • Shared rooftop lowers OPEX and boosts satisfaction

📣 MUYALTA’s layout maximizes return per square meter with future adaptability.


“We cleared 18 regulatory gates before asking for a single dollar.”

✅ 1. Land Ownership

  • Owned via a Mexican SPV (Special Purpose Vehicle) under Mystard S.A. de C.V.

  • No fideicomiso. No land risk. Clean legal title.

🏗️ 2. Construction License

  • Fully approved: Civil protection, zoning, architecture

  • Cleared via an 18-stage municipal process

  • Timeline and budget approved

🚧 3. Site Preparation

  • Site fenced with 1.2m public-sidewalk usage

  • Construction-grade perimeter walls

  • Pre-cleared and ready for foundation works

  • STO-ready via ERC-3643

  • Full KYC onboarding

  • Global investor-ready

📄 Legal governance via SPV, managed by Gustavo Calderón (Director) with fiduciary powers, DAO-advisory triggers, and legal control rights.

📣 This is not speculative. This is ready-to-build, shovel-ready development.


📍 3.4 — Construction Timeline & Delivery Schedule

“Construction doesn’t start with the token — it’s already planned, budgeted, and ready to go.”

🏗️ Construction Timeline

Stage
Duration
Phase

Preliminaries

85 days

Q2 2025

Foundations

84 days

Q2–Q3 2025

Structure

158 days

Q3–Q4 2025

Walls

106 days

Q4 2025

Electrical/Plumbing

150–170 days

Q4 2025 – Q1 2026

Finishing

174 days

Q1 2026

Final + Rooftop

85 days

Q1–Q2 2026

Delivery

~12 months

Q2 2026

💰 Budget Snapshot

  • Total: $44.4M MXN (~$2.5M USD)

  • Guaranteed for 12 months (no inflation drift)

  • Grupo 3 Servicios Constructivos: lead contractor

  • Structured with Gantt chart + milestone validation

🛠️ Site Efficiency

  • Full land coverage

  • City-authorized sidewalk zone

  • No unused square meter

🧾 Token Holder Timeline

Phase
Milestone

Q2 2025

Fundraise complete, construction begins

Q3 2025

DAO governance opens for $50K+ investors

Q4 2025

Progress updates with photos

Q1 2026

Tenant onboarding + furnishing

Q2 2026

First rental income distributions

📣 MUYALTA is a price-locked, pre-engineered, milestone-based real estate project delivering income within 12 months.